logo
Good price  online

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Ampoule Filling Machine
Created with Pixso. Complete Production Line Ampoule Filling Machine for 1–20ml Ampoules with Sterilizing Filling and Flame Sealing

Complete Production Line Ampoule Filling Machine for 1–20ml Ampoules with Sterilizing Filling and Flame Sealing

Brand Name: Lingyao
Model Number: LY-AF-20K
MOQ: 1 set
Price: USD 85,000–260,000/set
Delivery Time: 30–45 days after deposit
Payment Terms: T/T,L/C,Western Union
Detail Information
Place of Origin:
Shanghai, China
Certification:
CE, GMP, ISO 9001
Line Scope:
Turnkey, Including Utility Skids
Filling Range:
1–20 Ml
Production Capacity:
8,000–12,000 Pcs/h
Filling Accuracy:
±0.5%
Sterilizing Module:
Dry-heat Tunnel 300–350°C
Sealing Method:
Flame Sealing With Gas Monitoring
Utility Skids:
Air 0.6–0.8 MPa, Gas Train, WFI Interface
Installation Time:
15–20 Working Days On Site
Power:
16 KW, 380V/50Hz
Dimensions:
7,500 × 2,500 × 2,200 Mm (line Total)
Machine Weight:
4,200 Kg (line Total)
Packaging Details:
Export wooden case with anti-rust film and foam inserts
Supply Ability:
10 sets per month
Highlight:

ampoule filling machine with sterilizing

,

1-20ml ampoule filling machine

,

flame sealing ampoule filling machine

Product Description
Product Overview

This complete production line ampoule filling machine is a turnkey system covering the full 1–20ml range with sterilizing, filling and flame sealing, including all auxiliary equipment needed to start production: compressed air station, gas train, water treatment interface and control room panel. Turnkey delivery removes the engineering burden from the buyer, who receives a running line with documented performance instead of a collection of machines.

Problem

Buying a production line is a project, not a purchase. Buyers must coordinate machine delivery, utilities, installation, commissioning and validation across multiple suppliers, and each coordination gap delays production start. Projects routinely slip by three to six months because auxiliary equipment is forgotten: the gas train arrives after the machine, or the water treatment interface does not match the washer's connections.

Cause

The root cause is scope fragmentation: machine vendors quote only their machine, and the buyer's engineering team must fill every gap in utilities, installation and integration. Most plant teams are not staffed for this, especially in companies building their first ampoule line. Missing or mismatched auxiliary systems then cause cascading delays during commissioning.

Solution

This turnkey line includes the complete scope: the 1–20ml machine with sterilizing module, the utility skids (air, gas, water), installation supervision, commissioning and operator training, all under one contract with one schedule. The line is fully assembled and test-run at our factory, then shipped in coordinated modules that install in sequence. The buyer receives a single acceptance test covering the whole line, with one warranty and one service point.

Key Features
  • Turnkey scope of supply: machine, utility skids, installation, training under one contract
  • Full 1–20ml coverage: sterilizing, filling and flame sealing for the complete size range
  • Factory-assembled modules: coordinated shipment and installation sequence shorten site work
  • Single acceptance test: one FAT and one SAT cover the entire line
  • Utility skids included: compressed air, gas train and water interface pre-engineered
  • One warranty and service point: no multi-vendor coordination for support or spare parts
Technical Specifications
ParameterSpecification
Line Scopeturnkey, including utility skids
Filling Range1–20 ml
Production Capacity8,000–12,000 pcs/h
Filling Accuracy±0.5%
Sterilizing Moduledry-heat tunnel 300–350°C
Sealing Methodflame sealing with gas monitoring
Utility Skidsair 0.6–0.8 MPa, gas train, WFI interface
Installation Time15–20 working days on site
Power16 kW, 380V/50Hz
Dimensions7,500 * 2,500 * 2,200 mm (line total)
Machine Weight4,200 kg (line total)
Applications

This turnkey line is for greenfield pharmaceutical plants, existing plants adding their first ampoule capacity, and investors entering injectable production without a large in-house engineering team. It is also used by groups replicating production in new countries, where the standardized turnkey package reduces local project risk. The complete scope is particularly valuable in markets where specialized pharma engineering contractors are scarce.

For contract manufacturers, the single-contract structure allows clean cost allocation to the project and predictable commissioning schedules for client commitments.

Selection Guide

Define the full scope boundary before comparing quotes: confirm which items are included (utilities, installation, training, validation support) so you compare like with like. Second, verify the site conditions the supplier assumes, including ceiling height, floor loading and available utilities. Third, check the project schedule logic, especially the sequence of factory test, shipment and installation. Finally, agree on the acceptance criteria in writing, including output, accuracy and seal quality targets, before signing.

FAQ

Q: What exactly is included in the turnkey scope?

The standard scope includes the filling line with sterilizing module, compressed air skid, gas train, water interface, installation supervision, commissioning, operator training, and the FAT/SAT test program. Site civil works and cleanroom construction are typically buyer-provided, with our interface drawings supplied in advance.

Q: How long does installation take?

The coordinated module installation takes 15–20 working days on site, followed by 5–7 days of commissioning and training. The schedule is shorter than multi-vendor projects because the modules are pre-assembled and the interfaces are pre-engineered.

Q: Can the line be expanded later, for example with an isolator?

Yes, the control system and enclosure interfaces are prepared for future isolator or RABS integration. The turnkey package can be extended at that time with a defined upgrade scope and validation support.

Q: What training is provided for operators and maintenance staff?

The package includes 5 days of on-site training covering operation, size changeover, cleaning and routine maintenance, plus a training manual and video library. Advanced maintenance training at our factory is available as an option.

Packaging & Quality Assurance

Every machine is test-run with water and dummy ampoules for 72 hours before packing, and a sealed calibration report is shipped with the unit. The machine is wrapped in anti-rust film and secured in an export-grade wooden case with foam inserts, suitable for sea or air freight. We supply CE, GMP and ISO 9001 documentation, a 12-month warranty on parts, and lifetime remote technical support. On-site installation, operator training and IQ/OQ/PQ validation assistance are available on request.