| Brand Name: | ECER |
| Model Number: | AGF-10-20000 |
| MOQ: | 1 Set |
| Price: | USD 45000-120000 / Set |
| Delivery Time: | 45-60 Working Days |
| Payment Terms: | T/T, L/C |
Fixed-speed filling pumps with mechanical stroke adjustment require 15-20 minutes of downtime for format changes between different 10ml fill volumes. Contract manufacturing organizations (CMOs) running 3-5 product changeovers per shift lose 60-100 minutes of productive time daily to mechanical adjustments when using conventional filling equipment.
CauseMechanical stroke adjustment mechanisms for filling pumps use threaded lead screws with 1.5mm pitch and 0.1mm axial backlash, providing positioning resolution of approximately 50μL per increment for a 15mm diameter piston. Digital servo control with 17-bit absolute encoders provides 0.005mm resolution—a 10* improvement—eliminating the 15-20 minute manual adjustment and enabling recipe-based format change in under 2 minutes.
SolutionRecipe-based format changeover in our 10ml line stores all position, speed and timing parameters digitally. When an operator selects a new product recipe from the HMI, servo-driven filling pump stroke, starwheel pitch adjustment, flame-seal burner height and conveyor speed all reconfigure simultaneously in under 90 seconds. Zero mechanical adjustments, zero tools required, and first-ampoule verification confirms all parameters within specification before production resumes.
Key Features| Parameter | Specification |
|---|---|
| Ampoule Compatibility | 10ml (GB 2637 / ISO 9187 Type I borosilicate glass) |
| Production Capacity | 20000 ampoules per hour |
| Washing Method | Vertical ultrasonic (28kHz) + independent WFI water/air rinsing |
| Sterilization Temperature | 295-320°C, laminar-flow HEPA H14 filtered |
| Filling Accuracy | ±0.5% (servo ceramic piston, 10ml fill volume) |
| Filling Heads | 6 ceramic piston pumps, individually servo-driven |
| Sealing Method | Oxygen-natural gas flame, synchronized pull-seal with IR pyrometer feedback |
| Clarity Rate | >99% (post-wash inline camera inspection, 360° rotation capture) |
| Breakage Rate | ≤1% (whole-line, validated across 1M+ ampoules) |
| Control System | S7-1500 PLC + 10-inch HMI touchscreen, 50-recipe storage |
| Power Supply | 380V / 50Hz, 3-phase (60Hz / 440V customizable) |
| Line Footprint | 9500 x 1,800 x 2,200 mm (L x W x H) |
| Cleanroom Classification | ISO 7 (Class 10,000) room; filling zone ISO 5 (Class 100) laminar |
For 10ml ampoule production at 20000 pcs/h, this model suits facilities producing 160-320k ampoules per single/double shift. Select this capacity tier when your annual demand falls between 40-80 million ampoules. For start-up or clinical trial supply with lower initial volumes, consider our 10000 pcs/h variant. For high-volume commercial manufacturing, step up to the 30000 pcs/h model. Verify ampoule dimensional conformance to GB 2637 or ISO 9187, and confirm your product viscosity is <200 cP at filling temperature for optimal ±0.5% accuracy.
ApplicationsSuitable for pharmaceutical injectable products requiring aseptic processing in 10ml ampoule format. Ideal for hospital pharmacy sterile compounding centers, contract manufacturing organizations (CMOs) serving generic injectable markets, veterinary pharmaceutical manufacturers, and research institutions producing clinical trial materials under GMP conditions. Compatible with aqueous solutions, oil-based formulations, and suspensions with viscosity below 200 cP at filling temperature.
FAQQ: What is the typical IQ/OQ/PQ validation timeline?
A: Site acceptance testing requires 5-7 working days covering mechanical commissioning, sterilization cycle verification with biological indicators (Bacillus atrophaeus spores), and three consecutive media-fill runs per ISO 13408-1. A complete validation documentation package with executed protocols and raw data is provided.
Q: Can the line process amber or colored glass ampoules?
A: Yes. Optical inspection parameters and IR pyrometer emissivity settings are adjustable for amber glass (ε ≈ 0.85) versus clear borosilicate (ε ≈ 0.65). Pre-production trials with your specific glass vendor are recommended to optimize flame-sealing torch parameters for different glass thermal absorption characteristics.
Q: What preventive maintenance is required?
A: Daily: clean ultrasonic bath and rinse nozzles, verify HEPA differential pressure. Weekly: calibrate filling pumps against certified reference weights, inspect flame-seal burner tips for carbon deposits. Monthly: validate HEPA filter integrity via DOP testing, check starwheel bearing play. Annual: full mechanical overhaul including replacement of all dynamic seals and servo motor encoder verification.
Q: Is the line compatible with CIP/SIP systems?
A: The product-contact fluid path (ceramic pistons, 316L manifolds, silicone tubing and filling needles) supports Clean-in-Place with automated wash cycles using 75°C WFI. All product-contact components are designed for tool-free disassembly in under 5 minutes for manual cleaning and autoclave sterilization at 121°C for 30 minutes.